Study on the best time of refracturing for Hancheng coal seam
The old here wells in Hancheng Block face the problem of production decline after long-term exploitation, and need to be re-fractured to form new fractures to communicate with CBM rich areas, so as to achieve stable CBM production.Due to the small difference of initial stress in coal seam, the magnitude and direction of in-situ stress change signif